內蒙古G242甘臨一級公路:
甘其毛都口岸至臨河一級公路起點位于甘其毛都口岸規七路與外環線平交口處,途經中旗、后旗及臨河區,終點位于京藏高速臨河連接線JK0+902.316處。項目概算投資為42.3億元,主線全長183.3公里,建設標準為雙向四車道一級公路標準。公司承建該項目第四項目部路面分部工程。
Ganqimaodu-Linhe Highway of G242 in Inner Mongolia, Grade I Highway:
The Grade I Highway from Ganqimaodu Port to Linhe starts in the intersection of Guiqi Highway and Outer Ring Highway of Ganqimaodu Port, going through Mid Banner, Back Banner and Linhe District, and ends in the JK0+902.316 of Linhe Connection Line of Beijing-Lhasa Expressway. The project has the estimated investment of RMB 4.23 billion Yuan, the main line length of 183.3 km, and the construction standard of Grade I highway with two ways and four lanes. The company contacted to build the pavement engineering of the Project Department IV of the project.